Royal Navy’s third River-class OPV named
The Royal Navy has officially named its third River-class offshore patrol vessel (OPV) HMS Trent, BAE Systems announced on 13 March. The naming ceremony took place at BAE Systems’ site at Govan, Glasgow.
HMS Trent will support the navy in a range of operations including counterterrorism and anti-smuggling to secure the UK’s borders. The 90m vessels will be equipped with a 30mm cannon and a flight deck capable of receiving a Merlin helicopter.
Trent is now making final preparations to enter the water for the first time ahead of outfitting and systems installation. The vessel is expected to be delivered to the Royal Navy in the second half of 2018.
The first OPV, HMS Forth, joined the Royal Navy in January 2018. The second in class, Medway, is currently preparing for sea trials in the first half of this year. The fourth ship, Tamar, is now structurally complete, while the final River-class OPV, Spey, is under construction at BAE Systems’ Govan yard.
More from Naval Warfare
-
BAE Systems to collaborate with Umoe Mandal on Type 26 frigate and Littoral Strike Craft
The agreement is intended to boost opportunities for both UK and Norwegian naval shipbuilding.
-
How the Force Design 2028 will impact US Coast Guard acquisitions
The FD 2028 strategy intends to reduce the bureaucracy in procurement processes while speeding up the field of assets.
-
Thin-line towed arrays on uncrewed vessels deliver more cost-effective sonar, says SEA
Miniaturisation of technology opens up radical sensing technologies to smaller navies under submarine threat, according to SEA sonar expert.
-
£30 million UK-New Zealand deal sends new uncrewed vehicles to Ukraine
Sam Vye, the CEO of SYOS Aerospace, which supplied the vehicles, explained the rapid development and deployment of assets in the uncrewed world.
-
HII delivers first two Lionfish SUUVs to US Navy
The SUUVs could be part of a programme that scales to 200 vehicles.
-
HALO programme decommissioned by US Navy in favour of LRASM upgrades
The programme was due to be at full operational capability in the US Navy by 2031, but has been pulled over cost and timeline concerns.