USCG commissions 18th FRC
The US Coast Guard (USCG) has commissioned its 18th fast response cutter (FRC), USCGC Joseph Tezanos, in San Juan, Puerto Rico, it was announced on 26 August. It is the sixth cutter stationed in San Juan.
There are already 17 in service: five in San Juan, six in Miami and six in Key West. The USCG is acquiring upto 58 FRCs to conduct critical missions and patrol the near-offshore environment. The missions include national defence; fishery patrols; ports, waterways, and coastal security; drug and migrant interdiction; and search and rescue. It has so far ordered 38 cutters.
These vessels are replacing Island-class patrol boats and feature new command, control, communications, computers, intelligence, surveillance and reconnaissance equipment; improved habitability and sea-keeping; and standardised cutter boat deployment from astern or via side davits.
The commission of the next 154ft FRC, which will be stationed in Cape May, New Jersey, is planned for November 2016.
More from Naval Warfare
-
GAO recommends better oversight of support for shipyards in the face of capacity concerns
The US Government Accountability Office (GAO) believes the US industrial base will struggle to meet US Navy (USN) requirements. This follows recent warnings from USN heads of a decline in resources and that the industrial base is under strain.
-
Lockheed Martin wins three new DoD naval contracts including on Littoral Combat Ships
Lockheed Martin has won contracts and contract modifications on systems and platforms ranging from missile systems and naval helicopters to Littoral Combat Ships.
-
German Type 424 SIGINT vessel moves forward with keel laying
The first of the three vessels in Germany’s new SIGINT fleet has had its keel laid, with the expectation that it will enter service in 2029.
-
Airbus wins €480 million contract to build communications network for French air and naval forces
The IP Network, named RIFAN 3, will build on the work of previous RIFAN 2 network, with development work carried out on the new system between 2026 to 2030.