Navantia Australia signs MoU with CBG Systems
Navantia Australia has signed a Memorandum of Understanding (MoU) with CBG systems for insulation and fire protection supply for its bid for Australia’s Future Frigate project, the company announced on 11 April.
CBG designs, manufactures and installs a removable panelised structural fire protection system, which has been developed to sustain hydrocarbon fire and shock. The system consists of panels mounted below the deckhead allowing easy access to the vessel structure.
Under the MoU, CBG will also be responsible for the development of an insulation turn-key capability plan which will include a proposed approach to managing the skills and logistical requirements for insulation capability - the supply and storage of the material; the location of warehouse facilities and the allocation of work orders and workforce.
CBG’s system is currently deployed on the Navantia-designed Hobart class destroyers.
More from Naval Warfare
-
BAE Systems to collaborate with Umoe Mandal on Type 26 frigate and Littoral Strike Craft
The agreement is intended to boost opportunities for both UK and Norwegian naval shipbuilding.
-
How the Force Design 2028 will impact US Coast Guard acquisitions
The FD 2028 strategy intends to reduce the bureaucracy in procurement processes while speeding up the field of assets.
-
Thin-line towed arrays on uncrewed vessels deliver more cost-effective sonar, says SEA
Miniaturisation of technology opens up radical sensing technologies to smaller navies under submarine threat, according to SEA sonar expert.
-
£30 million UK-New Zealand deal sends new uncrewed vehicles to Ukraine
Sam Vye, the CEO of SYOS Aerospace, which supplied the vehicles, explained the rapid development and deployment of assets in the uncrewed world.
-
HII delivers first two Lionfish SUUVs to US Navy
The SUUVs could be part of a programme that scales to 200 vehicles.
-
HALO programme decommissioned by US Navy in favour of LRASM upgrades
The programme was due to be at full operational capability in the US Navy by 2031, but has been pulled over cost and timeline concerns.