Fourth P-8I MPA delivered to Indian Navy
Boeing has delivered the fourth of eight P-8I maritime patrol aircraft to the Indian Navy at Naval Air Station Rajali on 21 May.
The aircraft has joined the first three P-8Is currently undergoing operational evaluation. The aircraft will begin flight trials in the coming months.
The P-8I is the Indian Navy variant of the P-8A Poseidon that Boeing has developed for the US Navy. Boeing is delivering the aircraft to India under a contract signed in 2009.
The P-8I incorporates design features specific to the Indian Navy, as well as India-built subsystems that are tailored to the country’s maritime patrol requirements.
Dennis Swanson, BDS vice president in India, said: ‘This marks an important milestone – the halfway point for P-8I deliveries to The programme’s success the past year is really a testament to the great work between Boeing, the Indian Navy and industry.’
The P-8I features open system architecture, advanced sensor and display technologies, and a worldwide base of suppliers, parts and support equipment. P-8I aircraft are built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems, BAE Systems and GE Aviation.
More from Naval Warfare
-
Fincantieri and TKMS partner for Philippine submarine bid
The companies have banded together to promote the Fincantieri U212 NFS offering, and hinted that the collaboration may not be a one-bid phenomenon.
-
Naval modernisation accelerates amid geopolitical tension and tech evolution
The global naval market is undergoing a notable transformation, with growth driven by both escalating geopolitical tensions and the emergence of innovative technologies. Across NATO, but particularly in Europe, navies are accelerating modernisation efforts, spurred by renewed threats and persistent capability gaps.
-
Two new European logistics support vessels enter sea trials
The two Logistic Support Ships (LSS), contracted under Organisation for Joint Armament Co-operation, (OCCAR), should be commissioned into service later in 2025.