Construction begins on DDG 120
General Dynamics has begun construction of the US Navy’s future Arleigh Burke-class guided-missile destroyer, USS Carl M Levin (DDG 120), at its Bath Iron Works shipyard, the navy announced on 2 February.
DDG 120 will be configured as a Flight IIA destroyer and equipped with the US Navy’s Aegis Baseline 9 combat system which includes integrated air and missile defence capability. This system will deliver high firepower and increased electronic countermeasures capability for anti-air warfare.
The multi-mission Arleigh Burke-class destroyers provide the navy with undersea, surface, strike and ballistic missile defence along with providing increased capabilities in anti-submarine warfare, C2 and anti-surface warfare.
Delivery to the fleet is scheduled for 2021.
More from Naval Warfare
-
US Coast Guard enhances Arctic protection with a new Fast Response Cutter
After commissioning, FRC Frederick Mann will operate in Alaska and perform multiple missions.
-
US Coast Guard announces measures to further implement Force Design 2028 strategy
The US Coast Guard (USCG) created new units, including five Programme Executive Offices (PEOs), to facilitate and speed up the procurement of new capabilities.
-
Future of the US Navy’s Arleigh Burke programme remains unclear
The US Navy does not have a precise date for the award of the procurement contract for the third Arleigh Burke-class destroyer despite having the funds to advance with the programme in FY2025.
-
US Navy may look to foreign suppliers to accelerate shipbuilding programmes
The US Navy (USN) is currently reassessing its acquisition efforts and seeking ways to reduce the multiple delays across the shipbuilding initiatives.
-
Italy orders two ships as work begins on others along with deliveries and updates
The Italian Navy is being refreshed with two new ships ordered, while in the past six months steel was cut for a new frigate, an enhanced frigate was delivered and Horizon-class frigates passed a design review.