USAF places Lot 19 JASSM-ER order
The USAF will receive 400 Lot 19 AGM-158B Joint Air-to-Surface Standoff Missile-Extended Range (JASSM-ER) missiles from Lockheed Martin Missiles and Fire Control, under a new $428.41 million sole-source contract from the Air Force Life Cycle Management Center.
The manufacturer will also provide containers, training and production preparation, tooling and test equipment and hardware spares.
Lockheed Martin will carry out the work in Orlando, Florida, for completion by 31 July 2025.
JASSM-ER has a more fuel-efficient turbojet engine from Teledyne with greater fuel capacity, increasing the standoff range of the missile by 250% to more than 500nmi.
Customers include the US and Poland, while Finland could also receive the missile if it chooses the F-35 in the HX fighter competition.
As part of our promise to deliver comprehensive coverage to our Defence Insight and Premium News subscribers, our curated defence news content provides the latest industry updates, contract awards and programme milestones.
Related Equipment in Defence Insight
More from Air Warfare
-
Wedgetail rising as the aircraft continues to prove itself and wins fans
The Royal Australian Air Force (RAAF) was the lead customer for the E-7 Wedgetail airborne early warning and control (AEW&C) aircraft and the platform has been ordered by several countries with platforms ordered by the UK, with the US and NATO also selecting the platform.
-
Shield AI unveils V-Bat block upgrade
The heavy-fuel engine V-Bat was officially showcased at Sea Air Space, after it was first teased in February 2025.
-
Czech Republic confirms new Sweden offer on Gripen aircraft lease
The current lease period for the 14 Gripen C/D aircraft flown by the Czech Air Force will come to an end in 2027. This new offer proposes that 12 Gripen aircraft will be leased after 2027.
-
US Air Force to test Northrop Grumman’s next-gen connectivity capabilities in the CJADC2
NG InSight will be evaluated in support of the USAF Battle Network.
-
USAF’s VENOM programme advances with modifications and autonomous testing
The first fully modified aircraft is expected to begin testing by the end of 2025, according to the US Air Force.
-
Embraer and Denel to explore working on C-390 Millennium
The South African aerospace and defence company has signed an MoU with Embraer to collaborate on manufacturing the aircraft as well as MRO work for the C-390 Millennium.