Open menu Search

US Navy keeps Super Hornet production restart option open, but without defined cost or timetable

29th October 2026 - 15:04 GMT | by Flavia Camargos Pereira in Kansas City, Missouri

RSS

An F/A-18E being guided onto a catapult on the flight deck of the USS Ronald Reagan. (Photo: US Navy)

The US Navy plans to preserve Super Hornet and Growler tooling as production winds down, with restart costs unassessed and final F/A-18 deliveries expected in late 2027.

The US Navy (USN) plans to keep open the possibility of resuming the F/A-18E/F Super Hornet and EA-18G Growler manufacturing line after the recently announced shutdown, according to the Naval Air Warfare Centre Aircraft Division (NAWCAD).

A spokesperson for the NAWCAD told Shephard that the branch intends “to preserve the tooling, technical data and industrial capabilities needed to sustain” the fleets through 2040 and beyond, “while retaining the ability to consider restarting all or part of the production line if future requirements warrant”.

“The navy has not formally assessed the cost or schedule required to restart production as part of

Our news & analysis is now part of Defence Insight®

A Basic-level or higher Defence Insight subscription is now required to view this content.

LEARN MORE
Flavia Camargos Pereira

Author

Flavia Camargos Pereira


Flavia Camargos Pereira is a North America editor at Shephard Media. She joined the company …

Read full bio

Share to

Linkedin